Transmission links · Suffolk / Kent

Sea Link (Suffolk–Kent)

In planning

A 138 km primarily offshore link is awaiting its development-consent decision, expected by 30 October 2026. Surveys and archaeological works have separate permissions. These preparatory activities do not establish consent for the main link, whose construction programme is conditional on approval.

Sources reviewed 2026-10-08 · National Grid

Project facts

StatusIn planning
Developer / operatorNational Grid
RegionSuffolk / Kent
CountryEngland
Published ratingNot published
Rating definitionTransfer rating not verified
Connection / routeSuffolk ↔ Kent
Delivery target2031 (developer target; subject to change)
Total route length138 km

What this link contributes

This asset provides a route for electricity to move between networks or strengthens the network carrying that electricity. Its capacity cannot be added to wind, solar or power-station capacity as though it were another generator.

Suffolk ↔ Kent

Converter stations, cable manufacture, offshore installation, landfall works and grid energisation can progress at different times. The status above describes the documented project stage rather than assuming all work packages are complete.

Project location

Connection sites and areas are shown separately. Dashed circles mark approximate endpoint areas. No straight line is presented as the cable or overhead-line route.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. National Grid project information
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.