Interconnectors Β· Suffolk / Netherlands

LionLink Offshore Hybrid Asset

In planning

LionLink combines a connection to Dutch offshore wind with electricity exchange between Britain and the Netherlands. Current connection documents distinguish up to 2 GW export from 1.8 GW import. It remains a proposed project, not an operational source of supply.

Sources reviewed 2026-10-08 Β· National Grid Ventures / TenneT

Project facts

StatusIn planning
Developer / operatorNational Grid Ventures / TenneT
RegionSuffolk / Netherlands
CountryUnited Kingdom
Published rating2,000 MW
Rating definitionMaximum export connection
Connection / routeSuffolk ↔ Netherlands / offshore wind
Delivery targetNot verified in this profile
Import connection rating1,800 MW

What this link contributes

This asset provides a route for electricity to move between networks or strengthens the network carrying that electricity. Its capacity cannot be added to wind, solar or power-station capacity as though it were another generator.

Suffolk ↔ Netherlands / offshore wind

Converter stations, cable manufacture, offshore installation, landfall works and grid energisation can progress at different times. The status above describes the documented project stage rather than assuming all work packages are complete.

Project location

Connection sites and areas are shown separately. Dashed circles mark approximate endpoint areas. No straight line is presented as the cable or overhead-line route.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Current LionLink overview
    Reviewed 2026-10-08
  2. Connection agreement and capacity definitions
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.