In planning

Drax describes a first phase below 100 MW using a former coal-generation grid connection. This is a proposed electricity consumer at the power-station site, distinct from both Drax generation and the EGL2 converter. Later direct-generation options remain proposals.

Sources reviewed 2026-10-08 Β· Drax

Project facts

StatusIn planning
Developer / operatorDrax
RegionNorth Yorkshire
CountryEngland
Published rating100 MW
Rating definitionPhase-one upper bound
Connection / routeFormer coal-generation grid connection at Drax
Delivery target2027 (developer target; subject to change)

Developer proposal. October 2026 reporting describes a setback to the AI growth-zone bid. Neither designation nor its refusal determines the outcome of a separate planning application.

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Initial phase: imported grid electricity, according to Drax. Later direct supply from the power station is being explored; it is not confirmed operating supply.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Drax phase-one proposal and energy supply
    Reviewed 2026-10-08
  2. 6 October 2026 report on growth-zone backing (The Times)
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.