Spittal–Loch Buidhe–Beauly 400 kV Connection

In planning

The proposed 400 kV route is undergoing the consent process. The government’s appeal and inquiry record identifies inquiry, hearing and written procedures in 2026. This is not reported here as a consented or operating line.

Sources reviewed 2026-10-08 · SSEN Transmission

Project facts

StatusIn planning
Developer / operatorSSEN Transmission
RegionCaithness / Sutherland / Highlands
CountryScotland
Published ratingNot published
Rating definitionAC network reinforcement
Connection / routeSpittal ↔ Loch Buidhe ↔ Beauly
Delivery targetNot verified in this profile
Voltage400 kV

What this link contributes

This asset provides a route for electricity to move between networks or strengthens the network carrying that electricity. Its capacity cannot be added to wind, solar or power-station capacity as though it were another generator.

Spittal ↔ Loch Buidhe ↔ Beauly

Converter stations, cable manufacture, offshore installation, landfall works and grid energisation can progress at different times. The status above describes the documented project stage rather than assuming all work packages are complete.

Project location

Connection sites and areas are shown separately. Dashed circles mark approximate endpoint areas. No straight line is presented as the cable or overhead-line route.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Developer project
    Reviewed 2026-10-08
  2. Government inquiry case
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.