Data centres Β· Newport

Vantage CWL1 Newport Campus

Operating

The operator markets its CWL1 campus at Newport with 148 MW of capacity. This is a campus specification, not a published average electricity load. Additional AI deployments and phased expansion should be tracked separately from current consumption.

Sources reviewed 2026-10-08 Β· Vantage Data Centers

Project facts

StatusOperating
Developer / operatorVantage Data Centers
RegionNewport
CountryWales
Published rating148 MW
Rating definitionPublished IT capacity
Connection / routeCoedkernew, Duffryn, Newport
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacity148 MW
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Vantage markets the campus as using 100% renewable electricity. That claim does not provide site-specific hourly supply matching or annual consumption.

Cooling, water and backup power

Free air cooling benefits from the Welsh climate. Cooling configurations vary by building, including indirect evaporative systems.

N+N power topology is published. Current generator runtime and fuel consumption are not disclosed in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

Published facility or mapped building location. A location point is not a site boundary or a verified visitor entrance.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Vantage Data Centers project information
    Reviewed 2026-10-08
  2. Operator IT-capacity definition
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.