Operating

NTT describes 32 MW of critical IT load in the first building and 64 MW when fully built out. The larger value is an ultimate development figure. It does not show present occupation, site-wide draw or annual consumption.

Sources reviewed 2026-10-08 Β· NTT

Project facts

StatusOperating
Developer / operatorNTT
RegionGreater London
CountryEngland
Published rating64 MW
Rating definitionUltimate IT capacity
Connection / routeDagenham, east London
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacity64 MW
Grid connection capacityNot published
Apparent power reservation / substation rating80 MVA
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

NTT says the site uses guaranteed renewable electricity. This is a procurement statement; hourly matching and current metered consumption are not established here.

Cooling, water and backup power

NTT describes a water-cooled system with free cooling and N+1 redundancy. Site water use is not published in this profile.

Separate A and B UPS supplies with N+1 redundancy and generator backup. Generator fuel use and annual runtime are not published.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. NTT project information
    Reviewed 2026-10-08
  2. Opening announcement and renewable procurement
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.