β France power stations atlas
Octary Global Β· France Β· Wind
CHARRE02 - ADP 02 DE LA FERME EOLIENNE DE CHARRAUT (CHAPELLE BATON)
Saint-Secondin Β· Nouvelle-Aquitaine Β· Operating
25.20
MW installed as reported
β
Commissioning date, if provided

Engineering and capacity
- Technology
- Wind
- Detailed technology
- Terrestre
- Fuel
- Not supplied
- Installed power
- 25.200 MW
- Storage energy
- Not supplied; source units must be checked
- Voltage
- 90 kV
Location and responsible parties
- Commune
- Saint-Secondin
- Department
- Vienne
- Region
- Nouvelle-Aquitaine
- Location accuracy
- Commune only; exact site not verified
- Owner
- Not verified
- Operator
- Not verified
- Network manager
- RTE
Project timeline
- Commissioned
- Not reported
- Connected
- 2026-05-06
- Disconnected
- Not reported
- Reported status
- Operating
Connection and disconnection dates do not independently establish complete station construction or decommissioning history.
Technology graphics
Technology illustrations are reusable from Octary's UK atlas and are schematic, not photographs of this particular plant.

Source record
- EIC identifier
- 17W000002467750D
- Source family
- fr-rte-register