Aco Technologies Plc, Hitchin Road - Solar Panels is a 0.25 MW solar farm project in Eastern. The applicant or operator on record is Potentia Engineering Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority β¦
Consented / Approved
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-12-16.
Registered planning capacity; not measured generation.
Aco Technologies Plc, Hitchin Road - Solar Panels is a 0.25 MW solar farm project in Eastern. The applicant or operator on record is Potentia Engineering Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Central Bedfordshire, reference CB/25/02932/PASP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.