W/O Units 7-11, Abbotsinch Road, Grangemouth, Falkirk, FK3 9HG
Abbotsinch Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in Scotland. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is Falkirk, refβ¦
Consented / Approved
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-06-02.
Registered planning capacity; not measured generation.
Abbotsinch Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in Scotland. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is Falkirk, reference P/25/0120/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Year consented
2025
Location
W/O Units 7-11, Abbotsinch Road, Grangemouth, Falkirk, FK3 9HG